CDS scope included the full fabrication and construction to mechanical completion of the Easington Terminal works and offshore hook-up of the York unmanned platform including by system:
Terminal works
- Inlet area
- New sphere receiver
- Assessment and re-use of decommissioned slug catcher
- Gas processing plant
- Dehydration – new silica gel adsorption beds + regeneration facilities
- Plot space – utilise space currently occupied by redundant equipment
- Sales gas filters and metering
- Sales gas filters
- Sales gas metering runs and connection into NTS
- Liquids handling
- New condensate stabilisation, off-gas compression systems, existing condensate tankage
- Tie-in and integration to existing methanol tankage, recovery and delivery systems for conveyance to platform
- Tie-in and integration to existing corrosion inhibitor tankage and delivery systems
- Tie-in and integration to existing waste water treatment and waste water outfall
- Utility/safety systems
- Tie-in and integration into the following existing system infrastructure:
- Vent and blow-down systems
- Firewater
- Instrument air
- Fuel gas, nitrogen
- Drainage system
- Offshore platform hook-up works (43m water depth, jacket 800t, deck 1200t)
- 6 well slots
- Crane, Pig launcher, Helideck, TEMPSC
- Space for future tie-backs