CDS Fabrication Shop and Stublach Gas Storage Project, near Northwich in Cheshire
WORKSCOPE
CDS Energy has been awarded a six-figure contract to fabricate, NDT, hydrotest, paint, deliver and install pipework for a seven-day shutdown. Up to 15 jobs have been created within CDS’s fabrication shop and 30 jobs onsite.