Centrica Storage, Easington Terminal. Annual maintenance

PROJECT PROFILE

PROJECT
Centrica Storage, Easington Terminal. Annual maintenance
CLIENT
Centrica Storage
LOCATION
Easington Terminal, Easington, East Yorkshire
VALUE
£2,000,000 per annum

WORKSCOPE

Annual maintenance of live gas plant, provision of mechanical and civil personnel on an  ad-hoc basis and lift operations, maintaining/cleaning vessels/pumps and major equipment, formulating work packs. Work includes annual shutdown of live gas plant, with various scopes of work, including renewal of major plant equipment and pipework, vessel entry, assist, operations, co-ordinating sub-contractors and 40-80 black trades.

Centrica Storage, Easington Terminal. Annual maintenance
Download Case Study